Short answer
Every state plug-in solar law so far points to independent safety testing, but they don't all name the same thing. Of the 10 state laws in force or signed, 3 name UL 3700, the new plug-in-specific standard; 1 names UL 1741, an inverter standard; and 6 ask for a listing by an independent testing lab without naming either.
Check what your state's law names before you buy. The table below quotes each law's wording.
What each state's law names
The standard column is the law's own requirement, as we recorded it from the statute. 10 laws are in force or signed, and 8 bills are still pending.
Certification named in each state's plug-in solar law
3 of 10 state laws in force or signed name UL 3700.
| State | Status | Standard named in the law | Names UL 3700? | Size cap | Effective | Source |
|---|---|---|---|---|---|---|
| ColoradoLegal | Legal | Labeled and listed by an NRTL; outage protection | No | 1,920 W | Aug 12, 2026 | leg.colorado.gov |
| ConnecticutLegal | Legal | UL or equivalent NRTL and UL 1741; NEC, IEEE 1547, State Building Code; outage protection | No | 1,200 W | Oct 1, 2026 | cga.ct.gov |
| MaineLegal | Legal | Listed or certified to UL 3700, or to a comparable standard by an NRTL; or configured to the National Electrical Code as adopted in Maine | Yes | 1,200 W | Jul 29, 2026 | legislature.maine.gov |
| MarylandLegal | Legal | UL or equivalent NRTL | No | 1,200 W | Jul 1, 2026 | mgaleg.maryland.gov |
| UtahLegal | Legal | UL or equivalent NRTL; current NEC; outage protection | No | 1,200 W | May 7, 2025 | le.utah.gov |
| VermontLegal | Legal | UL 3700 or equivalent NRTL, and IEEE 1547-2018 | Yes | 1,200 W | Jul 1, 2026 | legislature.vermont.gov |
| CaliforniaSigned, not in force yet | Signed, not in force yet | Certified as a plug-in photovoltaic system by UL or an equivalent NRTL, plus an NRTL-certified feature that isolates the device to prevent backfeeding during an outage; must meet the current NEC and California Electrical Code | No | 1,200 W | Jan 1, 2027 | leginfo.legislature.ca.gov |
| New HampshireSigned, not in force yet | Signed, not in force yet | Certified by an NRTL to nationally recognized safety standards for distributed energy resources and plug-in solar systems | No | 1,200 W | Jan 1, 2027 | gc.nh.gov |
| New JerseySigned, not in force yet | Signed, not in force yet | UL 3700 or comparable standard(s) by an NRTL; outage protection | Yes | 1,200 W | Mar 1, 2027 | pub.njleg.gov |
| VirginiaSigned, not in force yet | Signed, not in force yet | NRTL (29 CFR 1910.7); current NEC; outage protection | No | 1,200 W | Jan 1, 2027 | law.lis.virginia.gov |
| New YorkPassed the legislature | Passed the legislature | Bill pending: no requirement in force yet | – | – | – | nysenate.gov |
| District of ColumbiaBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | lims.dccouncil.gov |
| IllinoisBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | ilga.gov |
| MassachusettsBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | malegislature.gov |
| MichiganBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | legislature.mi.gov |
| OhioBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | legislature.ohio.gov |
| PennsylvaniaBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | palegis.us |
| Rhode IslandBill moving | Bill moving | Bill pending: no requirement in force yet | – | – | – | status.rilegislature.gov |
"Names UL 3700?" is worked out from the wording: yes when it contains "3700". "Not verified yet" means we haven't read that part in the statute. Laws change; each state's page has the detail and the date we checked it. All 50 states and DC.
UL 1741 and UL 3700, side by side
Both are UL documents, but they were written for different things.
| Question | UL 1741 | UL 3700 |
|---|---|---|
| What it is | A UL standard for inverters, converters, controllers and interconnection equipment for distributed energy resources such as solar. UL | An Outline of Investigation for interactive plug-in photovoltaic equipment and systems. UL Solutions launched a certification program based on it on Jan 8, 2026. UL |
| Written for | Equipment for stand-alone or grid-connected power systems, "intended to be installed in accordance with the National Electrical Code". UL describes traditional solar as permanently installed and inspected by professionals. UL | Plug-in systems, which connect to household circuits through a plug and receptacle rather than being wired in. UL |
| What it covers | The inverter, converter, controller or interconnection equipment the listing names. For grid-connected equipment it is used together with IEEE 1547 and IEEE 1547.1. UL | Construction, performance and labeling. UL says it requires features that mitigate accidental contact with hazardous electric parts, promote safe installation, protect against overloads and prevent current from flowing in the wrong direction. UL |
| What to check | A kit can have a UL 1741 microinverter without the whole plug-in kit having been evaluated. The listing covers the product it names. | It covers equipment as well as systems, so check whether a listing names the whole kit or one part of it. |
We only state what these sources say. We don't quote technical limits such as trip times or wattages from either document.
"UL" isn't the only lab
OSHA recognizes 21 Nationally Recognized Testing Laboratories (NRTLs), including UL LLC, CSA Group, Intertek, TÜV Rheinland and TÜV SÜD (OSHA's current list, counted Oct 16, 2026). Where a state's law asks for an NRTL, or "UL or an equivalent", any lab on that list is one.
The electrical code hasn't caught up
The National Electrical Code (NEC), the model wiring code that states and cities adopt, doesn't cover plug-in kits. UL Solutions' code team puts it this way: The 2026 NEC, like all previous editions, does not recognize the use of plug-in photovoltaic (PIPV) modules.
(UL). The state laws name a product standard instead, and a few also mention the code; the table above shows each law's wording.
How to check a kit before you buy
- Look for the lab's mark and a file or certificate number on the product and its spec sheet, not just the letters "UL" in an ad.
- "Compliant with", "meets" or "designed to" a standard is not the same as "certified" or "listed" by a named lab.
- Check what the listing covers: the whole plug-in kit, or only the microinverter.
- Look the number up in the lab's own directory. For UL, that's UL Product iQ, which has a basic search you can use without an account. For other labs, open the lab's page from OSHA's list; each has a "Certification Listing Website" link (UL's, for example).
- See what we've already looked up. Our certified kits tracker lists the UL 3700 records and claims we've found, with sources.
- Match it to what your state's law names in the table above.
Landlords, utilities and the kit
A few laws add rules about who may put a kit up or what the kit must tell you. These are the ones we've read in the statute:
- Colorado, landlords: No person may directly or indirectly unreasonably prohibit a device (C.R.S. § 40-2-140(7)(a)); the act doesn't mention landlords or tenants. A property owner may set reasonable restrictions, including prior notice, fire or electrical-overload limits, damage prevention and location (§ 40-2-140(7)(d)).
- Maine, landlords: No landlord-permission rule. If you install on a structure you don't own, you must not compromise it or break building, fire or zoning codes, and must restore it on removal (35-A M.R.S. § 3475(8)).
- New Jersey, landlords: A landlord can't prohibit a tenant who pays the electric bill for the leased premises from using or placing a device there, including a leased balcony or patio, but may set reasonable restrictions on size and placement and may restrict placement elsewhere on the landlord's premises (§ 3(b)). The tenant gives at least 14 days' written notice with documentation that the device qualifies and its proposed location (§ 3(c)), is responsible for damage (§ 3(d)), and may be required to indemnify the landlord for claims from negligent installation, maintenance or use (§ 3(f)).
- Vermont, landlords: Tenant gives at least 10 days' notice. The landlord shall respond within 10 days with any reasonable restrictions, including requiring the tenant to pay for any electrical work and to hire a licensed electrician. If the landlord doesn't respond within 10 days, the tenant may go ahead. No electrical work without the landlord's permission, and the landlord can't be made to do or pay for it (30 V.S.A. § 256(g)).
- Virginia, landlords: A landlord who owns more than 4 rental units (or more than a 10% interest in more than 4) can't prohibit a tenant from installing a device on the exterior of the tenant's premises, but may set reasonable restrictions on size, place and manner of placement, and may prohibit or restrict it elsewhere on the premises. The tenant gives at least 7 days' notice with documentation that the device qualifies and its proposed location. The tenant is liable for damage. Not for units on a ratio utility billing system (RUBS), and no alterations to the premises, wiring or panels without the landlord's express written approval (§ 55.1-1212.1).
- Connecticut, power sent to the grid: Device must warn that generation above on-site use is charged as usage unless the meter allows net metering.
Other states' laws are silent on these points, or we haven't read that part yet; each state page says which.
Legal where you live?
Your address, the way your panels face and your utility's rate.
Sources and method
The state table is generated from our state-law data each time this page loads, so it changes when a law does. We last checked it . The other sources were opened and read on Oct 16, 2026:
- State laws: the source linked in each table row (CO, CT, ME, MD, UT, VT, CA, NH, NJ, VA, NY, DC, IL, MA, MI, OH, PA, RI).
- UL Solutions, press release, Jan 8, 2026: ul.com/news/ul-solutions-debuts-testing-and-certification-framework…
- UL Solutions, "Safety considerations for plug-in photovoltaic (PIPV) systems": ul.com/insights/…
- UL 1741, scope, in UL's standards store: shopulstandards.com
- OSHA, Current List of NRTLs: osha.gov, and its page for UL: osha.gov
- UL Product iQ: productiq.ulprospector.com
- UL Solutions, "The coordination between model codes and standards: 2026 National Electrical Code", read Oct 14, 2026: ul.com/thecodeauthority/…
General information, not legal or electrical advice. Follow your kit's instructions and your state's rules.